In preparation for a springtime garden celebration, WESL operating capacity has been tested at the current trackage maximum traffic load. The upper circuit, ground loop, and trolley line point to point were all occupied with transiting equipment. No interchange between the upper and ground occurs during automatic operation, since the trolley line intersects the interchange road. Also of note, the azalea and other early blooming plants are putting on a nice display.


Leave a comment